This is a formwork system which will good results for: - Reinforced slab floors (plain floors) - Beam floors with wide openings or the structures whose beam system continues on a certain standard - Beamless and mushroom floors of structures such as hotels, business centers, shopping centers, residents. - It is a floor formwork system to able to be used for shortening coarse structure building time by shortening formwork removal time. - As a surface component, sheet plates can be used in addition to plywood plates. - It is possible to get a plain surface which does not require parget. - Cup-lock or flanged scaffolding system can be used. - 3-4 days later than concreting, on condition that drop head and supporting scaffolding stood in their place, other elements can be removed. - A new scaffolding system can be erected with the auxiliaries of drop head and supporting scaffolding elements. - The system is composed of drop head, drop beam, steel grate elements (secondary beam), plywood (steel panel) and scaffolding components (props). - With this system, construction speed increases. - Also, deck component used for the floor decreases. - All the elements in the system don’t require crane and they are suitable to transport with hand. - Solutions according to floor thickness and project are produced. - For all these reasons, the system helps economical results. |